I keep a binder of every venue contract I’ve signed in the last ten years. I use it to check what my own countersignature has gotten me into with a second pair of eyes, because most contracts arrive as a 14-page PDF with a wet signature page at the end that you’re meant to print, sign, scan, and send back without ever having seen the rider on page 11, which is precisely how an association I was freelancing for in 2019 got stuck paying $18,400 in audio-visual damage claims for equipment that worked fine until the venue’s own electrician flipped the wrong breaker. That total sits in the margin of my binder in red pen.
The mutual indemnity that isn’t mutual at all
What shows up in most venue form contracts is a unilateral version that says you indemnify the venue for “any and all claims arising out of or in connection with the event, including those caused in whole or in part by the negligence of the venue.” A policy association I work with in the District got exactly this scenario four years ago, and their board ate a $9,700 settlement because the meeting planner at that time hadn’t asked to strike the sentence about venue negligence.

When I review a contract now, I write three words in the margin: “mutual causes to both.” The fix I propose is to replace the venue-negligence carveout with language saying each side indemnifies the other only for claims caused by the sole negligence of the indemnifying party. Try wandering past the buffet line at a event venue property and you will see why the property manager wants you to assume risk for your own people tripping over scooter cords.
The precise line that no planner should accept is broader and covers claims contributed to by comparative negligence, which is the scenario where the venue is 60 percent at fault, you are 40 percent at fault in a theory of shared blame, and the venue still expects a full reimbursement from you because the clause doesn’t carve out their portion. I just tell the venue sales manager we need to change the last sentence so we are only on the hook for our own portion.
Subrogation waivers and the insurance fine print
Indemnification does not do much good if the venue’s insurer can come after you for the loss in their own name. Waiver of subrogation, where defense lawyers for the hotel chain can step into the shoes of the venue’s property insurer and sue your coffee budget fund for the water damage after your local chapter’s annual gala in the gallery district of St. Louis caused a leak over a $20,000 parquet floor, is the part that makes my eyes cross.
I always add a clause that each party will cause their respective insurance policies to include a waiver of subrogation in favor of the other party. Since a CGL policy only provides that if the certificate of insurance holder has that endorsement, I request a certificate of insurance with the endorsement detailed.
The only practical venue inventory I can name that won’t swat this away includes two event venues in Alaska I’ve scouted, whose operators are basically a single family running a ski lodge, and those guys are not savvy on contract forms anyway.
A common reality from my own experience is that hotel chains ask for $1 million in general liability, while DC association headquarters properties commonly want $2 million due to being down the street from lobbying power. Address the waiver before you get into those specific underwriting numbers, because it is the waiver, not the limit, that actually protects you in subrogation.
Limits on liability that quietly don’t apply to their side
The contract’s limitation of liability section usually appears as a big paragraph that caps the venue’s financial exposure for any claim at the total amount of your function spend, typically $12,000 or $45,000 or whatever headline number your event had that year. But the venue drafts that clause to include their side capping the contract value to the entire spend for you, and then carves out subrogation itself, or states the limit does not apply to indemnification obligations.

I insist that any limitation on damages apply equally to both parties. I ask the venue to add their own limitation below the line that says “consequential damages also excluded from both sides,” meaning if your week is doomed to wander through tradeshow equipment costs for your Denver mountain-adjacent venue choices and miss a walk-through, they owe that out-of-court loss just the same as you would.
Force majeure can be the worst-written parole in the business
There is one agreement where I check force majeure before I sign, with no other contract page being more important for an association event planned 18 months out, and that’s if the DC line holds a 9 a.m. panel that needed travel. My reminder on force majeure is that venues write them narrow, excusing them if a utility outage can barely pinch their elevator service while you still pay full deposits if travel is halted.
Typical force majeure language excuses the venue if they cannot hold the event “due to circumstances beyond the venue’s reasonable control” but often says nothing about what obligations rest on your side when constituent registrants are behind a weather wall that makes it impossible for you to get people in the room. Every experienced planner knows force majeure language in Australia tells the venue to refund your prepaid food and beverage buyout of $43,000 when public health rules stop the gathering with only five days’ notice, yet US hotel form contracts keep the deposit.
I look for that language to give materially the same consequence, not a same-named excuse. When it works, I’ve recovered a $28,000 deposit from a client’s 350-person event that had its Washington Convention Center kickoff cancelled by track issues six weeks out. I also tell that longer turnaround story as a genuine lesson: a group backed out of the no-show speaker scenario needed just under 48 hours notice. That 51-word force majeure section lost my client three bedroom nights and $1,900.
So I wrote my own line with no precedent claim behind it: if the event is cancelled due to a force event, the venue refunds all prepaid and unpaid amounts that were not final third party costs actually incurred. They rarely object because they want the word “force” included in their insurance too. My bottom line is to request that language be “mutual between the parties,” meaning you lose a transfer cost legally as well.
Every association contract is grown out of a negotiation context plus a bound understanding. Keep the binder.
What headcount does your next scheduled event have on the table? Send over the date and the venue capacity and the proposal number, and I’ll draft a version for your signup with those pages flagged.